Networking the Kadoorie Biological Sciences Building

Readers may be interested to know about the status of networking in the Kadoorie Biological Sciences Building, now approaching the end of its construction.

Altogether 611 network points (386 for staff, 225 for ACEnet) have been planned for installation in the building.  These network points, each of which can support data transfer speeds of up to 100Mbps, will connect to the Campus Network via a building ATM switch, which joins the building to the existing Campus ATM backbone by means of 155Mbps fibre links.  Cable laying and termination for all network points, as well as for the optical fibre between the building and the Computer Centre, were accomplished in November.  Installation, configuration and testing of the network equipments are well under way at the time of writing.  It is expected that the entire building network infrastructure will be in place and ready for functional service before the end of this year.
 

T. Y. Shen
Tel: 2241 5229
E-mail: sty@cc.hku.hk



[Contents] [Next] [Previous]